The Clayton Engineering Company
  • Support Services
    • Planning, Zoning and City Council Presentations
    • BMP Inspections
    • ADA Accessibility Reviews
    • Company Brochure
  • Current Projects
  • News
  • Careers
  • History
  • Contact
  • Menu Menu
Blog - Latest News
You are here: Home1 / Donald Danforth Plant Science Center – Building 2 Campus Expansion2

https://claytoneng.com/wp-content/uploads/2017/01/clayton_eng.png 0 0 studio2108 https://claytoneng.com/wp-content/uploads/2017/01/clayton_eng.png studio21082015-11-13 15:41:472015-12-04 17:36:22

News

  • Dierbergs and McBride Homes to Develop Crestwood Mall Site
  • Hot Industrial Market
  • Mehlville High School Hosts Career Fair Day
  • Oakville High School STEM students work with Clayton Engineering survey crews
  • Ameren Missouri Opens New North Operations Facility

Current Projects

  • Dierbergs CrestwoodMarch 26, 2022 - 11:10 am

       

  • Aviator Business Park 2, 5 & 6January 8, 2022 - 8:36 am
  • A&S Railway Yard Entrance RaplacementJanuary 1, 2022 - 7:04 pm

CONTACT US

Clayton Eng
2268 Welsch Industrial Ct.
Maryland Heights, Missouri 63146
Phone: 314.692.8888
Fax: 314.692.8688

Facebook
LinkedIn
Instagram

RECENT PHOTOS

clayton_engineering

Providing civil engineering and land surveying to the St. Louis region for 94 years. #Surveying #Engineering #Planning

The Clayton Engineering Co.
Project benchmark, for drones. #dronetarget Project benchmark, for drones. #dronetarget
The Clayton Engineering Company is proud to work w The Clayton Engineering Company is proud to work with Dierbergs Markets and PARIC Corporation to provide civil engineering and surveying services during the development, design and construction of the new Dierbergs Crestwood. The 24.5 acre part of the 47 overall acre development will be the home of the new Dierbergs Crestwood store, with multiple other retail buildings totaling about 106,500 square feet. There are future outlots available for other developments on the property. The phases include an interim site development and the final construction phase. Clayton Engineering is providing consultant engineering services as well as coordination with the sewer district and other agencies during the development of the site. We are also providing survey control, construction staking and final as-built drawings for all phases of the project for the owner and contractors.

Our survey crews were on site this week for early grade staking and control checks as Bloomsdale Excavating began the grading.
We are looking for career minded enthusiastic new We are looking for career minded enthusiastic new employees to fill Civil Engineering and Survey drafting positions at Clayton Engineering! Currently seeking a PE/PM for our Civil Engineering group, an E.I.T ready to begin their career in Civil Engineering and a Lead Drafter for the Survey department. Find out more and submit your resumes here: http://claytoneng.com/jobs/ #surveying #career #civilengineering #Civil3D
1955 - The Municipal Engineers and Surveyors Assoc 1955 - The Municipal Engineers and Surveyors Association of Greater St. Louis was formed by Clayton Surveying & Engineering Co., and others. St. Louis Post Dispatch. #Engineering #surveying  #Claytonengineering
Project Spotlight - Aviator Business Park 2, 5 & 6 Project Spotlight - Aviator Business Park 2, 5 & 6: 
Since 2007, Clayton Engineering has been working on the civil engineering and surveying for the development of Aviator Business Park. This time around, buildings on Lot 2, 5 and 6 are in construction. These buildings total over 600,000 square feet, comprised of 3 separate properties. They are state of the art with the civil and storm water improvements, and site upgrades. Construction completion is expected in 2022. Clayton Engineering provides the Boundary Surveying, Platting and subdivision work, Civil development plan and construction plans for each of these properties, as well as the construction staking.
2021 Project Spotlight: A & S Railway Yard Entranc 2021 Project Spotlight: A & S Railway Yard Entrance Replacement

At the Alton & Southern Railway project, a sinkhole damaged the main entrance to the yard due to a failed storm water drainage system. The Clayton Engineering Company provided the existing conditions topographic survey of all entrance roads, utilities and overhead rail bridges, to be left alone. We also provided all demo, utility, construction calculations and staking as the project surveyor. Our crews, who are typically certified with OSHA 10 and First Aid/CPR training, also gained the eRailsafe clearances necessary to work on this project. When the project was complete, we provided the final topographic and As-Built survey back to our client.
#surveying #Railyard #construction #Claytonengineering #unionpacific
Load More... Follow on Instagram

© 2017 the clayton engineering company, inc. website designed and developed by Beanstalk
Scroll to top