The Clayton Engineering Survey group has been working on multiple projects around the Anheuser-Busch, Inc. brewery for over a year now. We have provided very detailed industrial topographic and control surveys for use with design-build portions of these projects where critical match existing points cannot be missed. We provide construction staking sometimes multiple times a week for civil improvements as well as columns, bolts, and high precision utilities. Clayton Engineering has provided civil engineering review when asked, as well as determined elevations for unique site areas throughout this work. We have worked with multiple trades throughout the construction of the new Seltzer Process building and connecting overhead rack & piping systems. We surveyed faces of walls, openings, steel, utilities and underground for this project. We were also able to research back into our historic records to use 50+ year old survey information for new construction underground possible conflicts. We were happy to provide our records to AB as well, and glad to be a part of these facility expansion projects.