by ClaytonEng1 | Jul 3, 2022 | Retail
The Clayton Engineering Company is proud to work with Dierbergs Markets and PARIC Corporation to provide consulting engineering and surveying services during the development, design and construction of the new Dierbergs Crestwood. The 24.5 acre part of the 47 overall...
by ClaytonEng1 | Jul 3, 2022 | Retail
MotoMart various locations – Clayton Engineering provides the initial site Surveying, Civil Engineering & Design for ADA compliance and site maintenance for MotoMart convenience stores at various locations throughout Missouri & Illinois. Additionally, MotoMart...
by ClaytonEng1 | Jul 3, 2022 | Retail
Clayton Engineering is the project surveyor for the construction of The Crossings at Richmond Heights. Working alongside Brinkmann Constructors in order to complete this ever evolving project, the tenants are filling spaces and project is near completion. This will be...
by ClaytonEng1 | Jul 3, 2022 | News
St. Louis Bread Company (Panera Bread) at Four Seasons Plaza, in Chestefield moved to a different location in the plaza, adding a drive through lane. Clayton Engineering worked on the civil engineering and site layout for this project.
by ClaytonEng1 | Jul 3, 2022 | Retail
American Arms Firing Range (Range St. Louis West) is one of the three lots developed in a 4.35 Ballwin development directly across from the Ballwin City Hall. American Arms is a store with a basement shooting range, Clayton Engineering provided Civil Engineering...