Motomart, one of our favorite clients, just opened up the new C-Store at Hwy DD & Caledonia Dr., O'Fallon, MO. If you haven't been through this area in a few months, it's all different now. The Streets of Caledonia has started to fill in with retail and...
Commercial & Industrial
In addition to the site development activities that accompany these projects (surveying, grading design, storm and sanitary design, roadway/transportation design), major improvements to offsite infrastructure are often required. Improvements may include railroad realignments, highway interchanges, waterway channelization and design.
Clayton Engineering’s extensive experience in these areas give us the ability to handle the technical as well as regulatory requirements to accomplish the tasks both confidently and efficiently. Through experience and expertise, our goal is to continually exceed client satisfaction and expectations.
Airport Survey
We pay attention to the details. Airport work is detail oriented work, including measurements, sketches, topographic surveying, photos, coordinating with the tower, escorts, access and lots of planning. If you have a project at an airport, we have the experience to...
ADA Improvements
ADA Improvements – Clayton Engineering has developed a comprehensive team of professionals to provide you with a solution to potential ADA non-compliance issues on your site. An ADA assessment report can be generated to aide the owner in deciding what issues would...
Dierbergs Lake Saint Louis
We are working to provide the utility construction staking for the new Dierbergs Lake Saint Louis development at the south west corner of Orf Rd. & Ronald Reagan Dr., Lake St. Louis, MO. The site is just west of the intersection of Highways 64 and 364. We will...
Anheuser-Busch, Inc. Seltzer Processes
The Clayton Engineering Survey group has been working on multiple projects around the Anheuser-Busch, Inc. brewery for over a year now. We have provided very detailed industrial topographic and control surveys for use with design-build portions of these projects where...
A & S Railway Yard Entrance Replacement
At the Alton & Southern Railway project, a sinkhole damaged the main entrance to the yard due to a failed storm water drainage system. The Clayton Engineering Company provided the existing conditions topographic survey of all entrance roads, utilities and overhead...
Aviator Business Park 2, 5 & 6
Since 2007, Clayton Engineering has been working on the civil engineering and surveying for the development of Aviator Business Park. This time around, buildings on Lot 2, 5 and 6 are in construction. These buildings total over 600,000 square feet, comprised of 3...
Dierbergs Crestwood
The Clayton Engineering Company is proud to work with Dierbergs Markets and PARIC Corporation to provide consulting engineering and surveying services during the development, design and construction of the new Dierbergs Crestwood. The 24.5 acre part of the 47 overall...